Surface to be painted is to be dry and clean. Surface preparation is performed as per
paragraph 7 (Finishing Works) of Construction Rules SP 71.13330.2017. Chalking, cracked
and peeling old coatings, possible emerging areas of old paint are to be removed with brush
or by washing. Surface is to be polished, and dust, dirt and fat are to be obligatorily removed.
When necessary, strengthen base with special consolidating and compacting agents.
Uneven areas and defects of plastered surfaces are to be putty-filled, cracks are to be
relevantly widened and filled with special compacting compounds (plaster and the like).
Undried surfaces and surfaces with high alkali content are to be put on hold for the necessary
time period for final solidification (4 weeks on the average).
Base layers with high absorptive capacity are to be pre-coated with the TRIOPRO™ PRIMER
1200 Deep Penetration Primer before painting. Priming is performed by a thin uniform layer,
not allowing liquid runs, omissions and breakages.